| Client | Scope of Work |
| KPE Contract 423 Project | Micro Chipping Concrete Grouting |
| Contract 859A – HarbourFront | Micro Chipping Concrete Grouting |
| Interchange Station Box Project | PU Grouting |
| Contract 851A – CCL 3 | Shotcreting PU Grouting |
| Contract 853 – Bishan MRT | PU Grouting |
| Contract 825 | Gel Grouting Under Water Cementitious Grouting PU Grouting |
| Circle Line Contract 822 | Gel Grouting PU Grouting |
| Contract 824 (Nicoll Highway) | PU Grouting Foam Grouting |
| Contract 855 – CCL 4 & 5 | Gel Grouting PU Grouting |
| Contract 703 | Chemical grouting |
| Contract 704 | Chemical grouting |
| Contract 706 | Chemical grouting |
| Contract 708 | Chemical grouting |
| Contract 709 | Chemical grouting |
| Contract 310 – Marina Bay – 1st Phase of MRT Lines | Grouting to leakages on cofferdams, tunnels segment, segment joints, leaking concrete structures and track base for waterproofing effect. |
| Contract 854 | Chemical grouting – NS grout |
| Contract 912 | Grouting injection – twin line pump or Traiver Gold 4200 pump |
| Contract 913 | PU Grouting |
| Contract 917 | PU Grouting |
| Contract 916 | Chemical grouting – NS grout |
| Contract 920 | PU Grouting |
| Contract 915 | Chemical grouting – NS grout |
| Contract 927 | PU Grouting |
| Contract 928 | Chemical grouting at tunnel precast segment |
| Contract 929A | Chemical grouting to tunnel areas |
| Contract 930 | Chemical grouting at tunnel precast segment |
| Contract 932 | Chemical grouting – TBM machine gap areas |
| Contract 937 | PU Grouting to base slab and tunnel segment |
| Contract T211 | Chipping Concrete Pressure Grouting |
| Contract T212 | Grouting with MC-Injekt 2700 wall area Chemical grouting MC Injekt 2033 to repair water leakages at honeycomb bare pipe |
| T226 Marina Bay Station (Thomson Line) | Pressure grouting of non-shrink grout to soffit |
| Client | Scope of Work |
| Deep Tunnel Sewerage System (Changi East) | Gel Grouting |
| Deep Tunnel Sewerage System (Link Tunnel) | Gel Grouting |
| Cable Tunnel EW3 | Chemical Grouting at cable tunnel precast segment |
| Cable Contract EW3 | PU grouting at ring segment tunnel |
| Cable Tunnel EW2 | Chemical Grouting to tunnel segment |
| Cable Tunnel NS2 | PU Grouting at tunnel segment socket, crack and joint |
| Senoko-Woodlands-Gambas And Labrador- Harbour Drive Tunnels | Chemical Grouting to precast segment at lifting socket, segment joint and segment crack |
| SP Cable EW1 (Ayer Rajah) | PU Grouting Gel Grouting |
| Cable Tunnel Contract (EW3) Tai Seng Station | Grouting with “GreenFlex 200” flexi gel grout at diaphragm wall |
| Contract ER 382 | Pressure grouting of non-shrink grout with or without pre-packed aggregates at wall |